Stefanik Wants To See Adirondack Line Fully Operational

U.S. Rep. Elise Stefanik has called on railway operators to address future disruptions to the Adirondack line.
Operations north of Saratoga Springs resumed on Sept. 11 after a summer-long hiatus. Stefanik is demanding that the 380-mile line be fully operational by next summer. The two-page letter was addressed to presidents Roger Harris of Amtrak and Tracy Robinson of Canadian National.